A clear request for quotation (RFQ) helps a metal stamping supplier understand the part, assess the manufacturing requirements, and identify questions before quoting. Missing details can lead to assumptions about material, tolerances, tooling, or inspection.
You do not need a perfect package to start a conversation. Sharing the information available—and flagging what is still under development—gives the supplier a useful basis for review.
Send a 2D drawing and, if available, a 3D CAD model. Make sure the files represent the same revision.
The drawing should identify:
Overall dimensions and critical features
Hole, slot, bend, and formed-feature locations
Dimensions that are especially important to fit or function
Tolerances for critical dimensions
Material thickness, if specified
Surface finish or coating requirements, if applicable
Drawing number, revision, and units
If the design is not final, label it as preliminary. This helps the supplier distinguish confirmed requirements from details that may change.
State the material grade and temper or condition when known. “Stainless steel,” “aluminum,” or “carbon steel” may not be specific enough for a production quotation because different grades and conditions can affect forming behavior and finished-part requirements.
If you are still selecting a material, describe the part’s operating environment and functional needs. For example, explain whether corrosion resistance, electrical conductivity, strength, weight, or appearance is a priority. The supplier can then review the options with your engineering team.
Do not substitute a material without approval. A change can affect forming, fit, performance, and any required validation.
Include the expected order quantity and, if possible, annual demand or forecast. Also state whether you expect:
Prototype or sample quantities
Initial production quantities
Repeat orders
Demand that may vary over time
Quantity and ordering pattern can influence the manufacturing approach, tooling discussion, and quotation assumptions. If volumes are estimates, label them as estimates rather than firm commitments.
Briefly explain where the part will be used and what it needs to do. Include relevant details such as:
Mating parts or assembly interfaces
Loads, movement, or operating conditions
Indoor or outdoor use
Exposure to moisture, chemicals, heat, or vibration
Cosmetic surfaces or visible areas
Any assembly, joining, or packaging needs
Application context helps the supplier understand which dimensions and characteristics may be critical. It also helps identify questions that may not be obvious from the drawing alone.
List any required finishing or follow-up operations, such as coating, plating, deburring, welding, tapping, or assembly. Where applicable, include the specification, appearance requirement, or reference standard.
If you are unsure which operations are needed, describe the end-use requirements and ask the supplier to identify what needs clarification. Avoid relying on a general phrase such as “standard finish” when the part has a specific corrosion, appearance, or assembly requirement.
State any inspection or documentation requirements that apply to the project. Depending on the part and customer requirements, these could include:
Inspection dimensions or characteristics
Sample or first-article review
Material or finishing documentation
Packaging and part identification
Traceability requirements
Customer-specific quality documents
Only include standards and approvals that your project actually requires. If a requirement is still being reviewed, mark it as pending confirmation.
Describe how parts need to be packed to prevent damage, contamination, or mix-ups. If you have shipping or labeling requirements, include them in the RFQ.
You can also provide the destination country and preferred delivery terms if known. Any requested schedule should be identified as a target for review, not treated as confirmed until the supplier has assessed the project.
A useful RFQ makes uncertainty visible. Add a short section for items that are not yet decided, such as:
Final material grade
Production forecast
Critical-to-function dimensions
Surface finish
Packaging method
Approval or validation requirements
This gives both sides a clear list to resolve before finalizing the quotation or production plan.
Before sending your request, check that you have included:
Current drawing and CAD file, if available
Drawing revision and units
Material and thickness, if known
Critical dimensions and tolerances
Estimated quantities and order pattern
Part application and functional requirements
Finishing and secondary operations
Inspection and documentation needs
Packaging and destination details
Open questions or provisional requirements
Yes. Label the drawing as preliminary and identify which details may change. The supplier can review the available information and point out what is needed for a firmer quotation.
Identify the critical dimensions and functional requirements. If a tolerance is not defined, ask the supplier to flag any dimensions that need clarification. Avoid assuming that unspecified dimensions will meet a particular requirement.
A 3D model can help explain formed geometry and part relationships. A 2D drawing is still useful for communicating dimensions, tolerances, material, revision, and inspection requirements. When both are provided, keep their revisions aligned.
Provide your best estimate and explain how demand may change. Clearly mark forecasts as estimates so they are not mistaken for a firm order commitment.
Preparing an RFQ for a custom stamped component? Send your drawing, material details, estimated quantity, and application requirements for review.
CTA button: Send Your Drawings
Suggested internal links: Sheet Metal Stamping; Stamping Dies; Contact Us
Inquiry
Article Navigation